previous next

Jurkovič Heating plant is preparing for a final inspection

Despite the current pandemic situation, we continue with the reconstruction of the national cultural monument - Jurkovič Heating plant and these days, we are preparing for the final inspection.
Works on the facade are already finished and we currently continue with the works inside the premises so the future tenants can start with the fit out works as soon as possible.

At Jurkovič Heating plant, in addition to flexible offices, premises such as restaurants and café with an art gallery will be there as well, so the public can also visit this industrial monument